Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 75: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2019
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
73982 REL 75
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2019
Contract Continuation:
Previous: Next:
73982 REL 48: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 18
  • 73982 REL 101: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2020
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish. The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects. The Project embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008). The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team. Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2019 the project will be focused on planning, design, and implementation of fish habitat enhancement projects along Catherine Creek and Upper Grande Ronde and tributaries.  Project implementation for summer and fall/winter 2019 includes the Grande Ronde River-Bird Track Springs Fish Habitat Enhancement Project Phase 2, and the Grande Ronde River-Middle Upper Grande Ronde River (MUGRR) Phase 1.  Project planning and design includes the Grande Ronde River-MUGRR (Phases 2 and 3) and the Grande Ronde River-Longley Meadows.

Project staff will continue to work on developing new project opportunities in Catherine Creek, Grande Ronde River, and tributaries.

Land acquisition planning will continue during FY2019 with identification and development of acquisition opportunities.

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.  
Account Type(s):
Expense
Contract Start Date:
05/01/2019
Contract End Date:
04/30/2020
Current Contract Value:
$959,539
Expenditures:
$959,539

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Kevin Cannell Bonneville Power Administration No Interested Party kgcannell@bpa.gov (503) 230-4454
Allen Childs Umatilla Confederated Tribes (CTUIR) Yes Contract Manager allenchilds@ctuir.org (541) 429-7940
Lisa Dexter Bonneville Power Administration Yes Contracting Officer lldexter@bpa.gov (503) 230-3893
Daniel Gambetta Bonneville Power Administration No Interested Party dagambetta@bpa.gov (503) 230-3493
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Travis Kessler Bonneville Power Administration No Env. Compliance Lead tdkessler@bpa.gov (503) 230-5468
Jake Kimbro Umatilla Confederated Tribes (CTUIR) Yes Technical Contact jakekimbro@ctuir.org (541) 429-7941
Michael Lambert Umatilla Confederated Tribes (CTUIR) No Supervisor mikelambert@ctuir.org (541) 429-7240
Anna Neuzil Bonneville Power Administration Yes Interested Party aaneuzil@bpa.gov (503) 230-4642
Tybee Sheidler Bonneville Power Administration No Interested Party tasheidler@bpa.gov (503) 230-3820
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2020 04/30/2020
Effective implementation management and timely contract administration B: 119. Bird Track Springs Fish Habitat Enhancement Project Administration 04/30/2020 04/30/2020
Install large wood complexes and habitat boulders to increase habitat complexity and diversity C: 29. Bird Track Springs - Enhance and restore fish habitat complexity and diversity with large wood structures 11/30/2019 12/20/2019
Completed channel construction D: 30. Bird Track Springs - Excavate new channels and construct riffles, glides, and point bars 11/30/2019 12/20/2019
Conduct Fish Salvage Operations E: 28. Bird Track Springs Project - Conduct Fish Salvage Operations 10/15/2019 10/15/2019
Plant native trees, shrubs, and grass on the Bird Track Springs Project F: 47. Bird Track Springs Project - Plant native trees, shrubs, and grasses 04/30/2020 04/30/2020
Effective implementation management and timely contract administration G: 119. Middle Upper Grande Ronde River (MUGRR) Fish Habitat Enhancement Project Administration 04/30/2020 07/26/2019
Install large wood complexes and habitat boulders to increase habitat complexity and diversity. H: 29. MUGRR Enhance and restore fish habitat complexity and diversity with large wood engineered log jams 04/30/2020 07/05/2019
Plant native trees, shrubs, and grass on the Middle Upper Grande Ronde Project I: 47. Plant native trees, shrubs, and grasses on the Middle Upper Grande Ronde River Project 11/30/2019 11/29/2019
Conduct Fish Salvage Operations J: 28. Conduct Fish Salvage Operations on the Middle Upper Grande Ronde River Project 07/31/2019 07/05/2019
Conduct maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, and Catherine Creek Projects K: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2020 04/30/2020
Maintain vegetation and control weeds on conservation projects L: 198. Maintain Vegetation and Control Weeds on conservation projects 04/30/2020 04/30/2020
Complete outreach & education activities M: 99. Public Outreach and Education 04/30/2020 04/30/2020
Conduct ongoing project development and coordination activities N: 114. CTUIR Grande Ronde Subbasin Restoration Projects Coordination 04/30/2020 04/30/2020
BiOp Fish Habitat Project Opportunity Development and Review O: 114. Solicit, review &select BiOp expense & capital projects - Implementation Team & Technical Input 04/30/2020 04/30/2020
Develop project design plan sets P: 174. Develop project designs and produce plans 04/30/2020 04/30/2020
Pre-project and post evaluations Q: 186. Pre & post project evaluations 04/30/2020 04/30/2020
Administer Project R: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2020 04/30/2020
Upload 2019 Annual Report S: 132. 2019 Annual Report - May 2019 - April 2020 04/30/2020 04/30/2020
Upload Completion Report T: 141. Other Reports for BPA 04/30/2020 04/30/2020
Upload Completion Report U: 141. Other Reports for BPA 04/30/2020 04/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 28 Trap and Haul
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 47 Plant Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 28 Trap and Haul
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 01/01/2019
B 119 Bird Track Springs Fish Habitat Enhancement Project Administration 01/01/2019
C 29 Bird Track Springs - Enhance and restore fish habitat complexity and diversity with large wood structures 01/28/2019
D 30 Bird Track Springs - Excavate new channels and construct riffles, glides, and point bars 01/28/2019
E 28 Bird Track Springs Project - Conduct Fish Salvage Operations 01/28/2019
F 47 Bird Track Springs Project - Plant native trees, shrubs, and grasses 01/28/2019
G 119 Middle Upper Grande Ronde River (MUGRR) Fish Habitat Enhancement Project Administration 01/01/2019
H 29 MUGRR Enhance and restore fish habitat complexity and diversity with large wood engineered log jams 01/28/2019
I 47 Plant native trees, shrubs, and grasses on the Middle Upper Grande Ronde River Project 01/28/2019
J 28 Conduct Fish Salvage Operations on the Middle Upper Grande Ronde River Project 01/28/2019
K 186 Maintain instream structures, fences, and off-channel water developments 01/28/2019
L 198 Maintain Vegetation and Control Weeds on conservation projects 01/28/2019
M 99 Public Outreach and Education 01/01/2019
N 114 CTUIR Grande Ronde Subbasin Restoration Projects Coordination 01/01/2019
O 114 Solicit, review &select BiOp expense & capital projects - Implementation Team & Technical Input 01/01/2019
P 174 Develop project designs and produce plans 01/28/2019
Q 186 Pre & post project evaluations 02/27/2019
R 119 Manage and Administer CTUIR GR Subbasin Restoration Project 01/01/2019
S 132 2019 Annual Report - May 2019 - April 2020 01/01/2019
T 141 Other Reports for BPA 05/01/2019
U 141 Other Reports for BPA 05/01/2019
V 185 Periodic Status Reports for BPA 05/01/2019